Well I have been to Hawaii and Japan, that's my only excuse for no posts, but it seemed to take two weeks to get over the jet lag from Japan, that place will mess your system up. Eating breakfast for supper and having an adult beverage for breakfast :shock:
I have most of the stringer battens in place for the floors. I poured foam into the front hatch area and laid the floor down. I moved some plumbing forward and need to install the forward floor. Man that sounded easier than it was :?
Cardboard templates was the key to making the floors and having them fit good.
Hope to have the main floor in place and the front deck "planned" out by year end. Thinking of rigging and painting more and more each day. Spent a good bit of time debating on a fuel tank and it's location. Decided it couldn't be decided until it is on the water. Making the front area with a hatch with three options for a fuel tank. Near B bulkhead, near A bulkhead or forward of A bulkhead. Will have to see how she planes out and carries herself at WOT. I may need some weight forward if she porpoises. Only one way to tell and that is on the water under power.
Actually laid the front floor today and cut out the main floor. The main floor is curing with it's first batch of resin and fiberglass. Hope it tacks up enough to add another layer tonight. Main floor should be in by the first of the year, not finished but in.
Inch by inch it's getting there.